SCOPE OF WORK: As per the attached documents.
Tender Document : Tender Notice|
SCOPE OF WORK: CLEANING OF GRASS, WILD SHRUBS INCLUDING CUTTING OF BUSHES & UNWANTED PLANTS IN PERIPHERAL AREA ADJACENT TO BOUNDARY WALL INSIDE 132/33 KV GRID SUB-STATION, PHULBANI UNDER EHT (O&M) DIVISION, BHANJANAGAR.
Tender Document : Tender Specification|
SCOPE OF WORK: Construction of concrete road from control room to back gate at 132 KV Swt. Stn. BC Mohanty, Baliapal under EHT (O&M) Division, OPTCL, Jajpur Road.
SCOPE OF WORK: Providing security/line patrolling service at substation office store under Northern zone Balasore
Tender Document : Tender Specification| Scope of Line Patrolling Services| Scope of Security Services|
SCOPE OF WORK: Painting of Auto Transformers , Power Transformers and Station Transformers commissioned at 220/132/33 KV GIS S/S Chandaka-B under EHT (O&M) Division, Bhubaneswar.
SCOPE OF WORK: Repair of damaged stubs at 57 nos. of stubs of EHT Towers of different EHT Lines under EHT (O&M) Division , Khurda.
SCOPE OF WORK: Supply of Discharge Rod for different Grid Sub-Stations under EHT (O&M) Circle, Bhubaneswar.
SCOPE OF WORK: Renovation of C & R Panel foundation, cable trench, control room slabs, fitting of tiles in control room, doors in ACDB room and painting of equipment structure’s foundation base & legs in switchyard (both 132KV & 33KV) at Grid S/S, Rairangpur under EHT(O&M) Division, Baripada.
SCOPE OF WORK: Engagement of Diesel Run Commercial Registered Light vehicles 05 seated Pick up Van/Camper or equivalent monthly hired basis with daily hiring rate for SDO (Elect.) of 132/33KV Grid S/S, Khariar under EHT (O&M) Division, Nuapada on monthly hired basis.
Tender Document : Tender Notice| Corrigendum-I|
SCOPE OF WORK: Painting of six nos. of Power Transformers commissioned at different Grid Sub-Stations (Khurda, Argul & Chandpur) under EHT (O&M) Division, Khurda.
SCOPE OF WORK: RATE CONTRACT AND ENLISTMENT OF FIRMS FOR ONLINE ON SITE TRANSFORMER OIL DRYING DESLUDGING AND REREFINING WORK FOR TRANSFORMERS AT VARIOUS GRID SUBSTATION OF OPTCL IN THE STATE OF ODISHA.
SCOPE OF WORK: LOT-I: Construction of RCC Slabs for replacement of damaged cable trench slabs at 220/132/33 KV Grid Sub-Station, Bhanjanagar. LOT-II:
Tender Document : Tender Specification (LOT-I)| Tender Specification (LOT-II)|
SCOPE OF WORK: TOWARDS PROCUREMENT OF 500 MVA, 400/220 KV ICT– 01 NO.
SCOPE OF WORK: Invitation for Expression of Interest (EOI) for hiring of spare fibre in Block to Gram Panchayat(GP) .
Tender Document : Notice| Annexure-I| Introduction| Annexure-IV|
Tender Document : Corrigendum-I| Tender Specification|
SCOPE OF WORK: Engagement of AC Mahindra Bolero/Sumo/ Equivalent Vehicle of Diesel Version on monthly basis engagement under Office of the Executive Director Western Zone, OPTC, Burla, PG Chowk,Sambalpur-768017.
SCOPE OF WORK: Construction of additional earthing at different locations of different EHT lines of EHT(O&M) Sub-Division Bhubaneswar under EHT (O&M) Division Bhubaneswar.
SCOPE OF WORK: PCC work for open store yard at the end of 132 kV switchyard for storage of unused material at 220/132/33 kV Grid Sub-Station Chandaka under EHT (O&M) Division Bhubaneswar.
SCOPE OF WORK: REPAIRING CABLE TRENCH AND LAYING OF IRON CHECKER PLATE TO COVER CABLE TRENCH IN C/R AND RECONSTRUCTION OF TWO NOS. OF CULVERTS OVER CABLE TRENCH IN FRONT OF CONTROL ROOM AT 132/33KV GRID SUB-STATION, RAYAGADA.
SCOPE OF WORK: Supply of LED Flood Light & Street Light for 400/220/33KV Grid S/S New Duburi.
SCOPE OF WORK: REPAIRING OF FIRE FIGHTING SYSTEM AT 400/220/132KV GRID S/S, MERAMUNDALI UNDER EHT (O&M) DIVISION, MERAMUNDALI.
Tender Document : Tender Specification| Corrigendum-I|
SCOPE OF WORK: Engineering, Supply, Erection, Testing and Commissioning of 2X20 MVA, 132 KV Grid Sub station with SAS, Process Bus based, Rampur at Agalpur with associated 132 KV LILO Transmission line on 132 KV Bolangir Barpali SC line, in Bolangir district of Odisha on Turnkey CONTRACT BASIS.
Tender Document : Tender Document| Scope of Work|
"When safety is ensured, the confidence and efficiency level of employees get manifold."